A 200,000 sq m complex on the Nações Unidas corridor
Opened in 1995 on Avenida das Nações Unidas in the south of São Paulo, WTC São Paulo brings together several assets on a single site. These include the Sheraton São Paulo WTC and its 296 rooms, an office tower of around 25,000 sq m of gross leasable area, the D&D shopping centre, which specialises in decoration and interior architecture, and an events centre with capacity for 2,500 people.
BTG Pactual now holds 80% of the complex. The acquisition price has not been disclosed and the bank declined to comment, according to the Brazilian business daily Valor Econômico. The complex covers a total of 200,000 sq m, and the works programme is set to take this to around 220,000 sq m, an increase of 10%.
Keeping visitors for longer, including in the evenings and at weekends
The site currently welcomes around 220,000 visitors a month. According to its chief executive, Sheyla Resende, the aim is not to attract every type of visitor but to give people reasons to stay longer and do more while they are there. Evening and weekend footfall is a priority.
Sheyla Resende has led WTC São Paulo since September. She spent most of her career at the developer Gafisa, which she headed for three years. She cites Marina Bay in Singapore and Hudson Yards in New York as benchmarks for the transformation of the complex.
The cultural programme will be expanded alongside the existing corporate business, notably through the complex’s 525-seat theatre. The capacity of the Golden Hall will be raised to 3,500 so that it can host live shows. According to a source close to the matter, artists are interested in longer residencies on site.
🔗 Also on LTH: São Paulo’s Maksoud Plaza targeted by a mixed-use project of 398 homes and 152 hotel units
Restaurant space more than doubled
Much of the additional floor space will go to food and beverage. The areas dedicated to it will grow from 1,600 to 3,800 sq m, with six destination restaurants whose contracts are still under negotiation. Two of them will be located at the top of the complex, overlooking the Ponte Estaiada, the city’s landmark cable-stayed bridge.
The shopping centre already has new seating areas and eight newly opened kiosks dedicated to cosmetics, confectionery, wine, fashion and tableware. The floors will also be resurfaced. Management plans to add services such as a beauty salon and a spa.
The events centre, which hosts 36 events a month, will be upgraded to increase its capacity and cut set-up and dismantling times.
Sheraton refurbished, brand retained for now
The hotel is part of the programme: the lobby, spa and gym will be redesigned. The Sheraton brand is being retained for the time being. However, according to the source close to the matter cited by Valor Econômico, a renegotiation is not ruled out in the medium term.
The same source believes there is scope for value uplift across each of the complex’s assets: the tower, the shopping centre, the hotel and the events space. Management also intends to move these assets up a grade.
Office tower already 92% let
The corporate tower, which will also receive a new lobby, is classified as Grade B. The most premium assets on the property market are rated AAA. According to Sheyla Resende, the tower is already 92% let. Talks with tenants are under way that take the new positioning into account, and management is targeting full occupancy in 2027.
The backdrop is supportive. According to JLL, the vacancy rate for high-end office buildings in Berrini, the business district where the WTC is located, stood at 11% in the third quarter, compared with an average of 14.1% for the city as a whole. BTG’s investment comes as demand for office and corporate space is picking up again in São Paulo. Meanwhile, the traditional office districts in the south of the city have seen the arrival of new mixed-use complexes such as Parque da Cidade and Alto das Nações.
🔗 Also on LTH: Brazil | Iguatemi and Catuaí invest more than €162m in the return of Four Seasons in 2030
What investors will be watching
Analysis – With the tower already almost fully let, the programme will not be judged on occupancy. It will be judged on growth in effective rents and in the operating income of each component. For the hotel, the future of the Sheraton brand will be worth watching closely: a renegotiation of the franchise or management agreement could form part of the repositioning.
The deal follows a logic that is increasingly common among institutional investors: treating a mixed-use estate as a single destination rather than as a series of separate assets. The same trend can be seen in the Brazilian hotel market, as shown by the joint venture formed by CPP Investments and HSI to acquire two Hilton hotels.
At a glance by The Hospitality Tribune
BTG Pactual repositions WTC São Paulo
BTG Pactual now holds 80% of the mixed-use complex and is investing BRL 100 million (c. €17m) in its refurbishment
The 296-room Sheraton São Paulo WTC gets a new lobby, spa and gym; the brand is kept for now, with renegotiation not ruled out
Restaurant space to grow from 1,600 to 3,800 sq m, with six destination restaurants
Golden Hall capacity raised to 3,500; total built area up 10% to c. 220,000 sq m
Grade B office tower already 92% let, with full occupancy targeted for 2027















