Greece | Egyptian Billionaire Naguib Sawiris Invests €100 Million in Future Silversands Mykonos

Publié le

☟ Right sidebar
Article top ad ☟

Naguib Sawiris, founder and chairman of Ora Developers, has confirmed an investment of around €100 million in Silversands Mykonos.

In his first interview with a Greek outlet, Naguib Sawiris told Thema that he has been coming to Mykonos for decades and has a very special relationship with the island. He said he has lived through truly exceptional moments there, which is why the project is also a personal matter for him, and that he wanted to create something genuinely special, reflecting his love for Mykonos and leaving a positive mark on the island.

An investor with roots in telecoms

Before turning to real estate and hospitality, Naguib Sawiris built his fortune in telecommunications. He founded and led Orascom Telecom Holding, an operator that became one of the leading telecoms groups in emerging markets, active across Africa, the Middle East and South Asia, before its integration into the VEON group. His fortune is estimated at around $7.3 billion according to the Bloomberg Billionaires Index.

Inline article ad ☟

A member of the Sawiris family — one of the most influential in Egyptian business, alongside his brothers Onsi and Samih Sawiris, themselves leading investors — he founded Ora Developers in 2016, then named Gemini Global Development before being rebranded in 2018, to develop a diversified portfolio spanning residential real estate, energy, agri-food, logistics, mining, gold and, more recently, luxury hospitality through its Ora Hospitality division.

A timeline reshaped by construction constraints

The project, located in Kalafatis, occupies a 42,000 sqm plot. Its opening, originally planned for 2026, has been pushed back to May 2027. The businessman owns the delay, explaining that construction has taken longer than expected and that a project of this scale sometimes requires more time than initially estimated.

Asked about the source of the delay — whether construction, bureaucracy, permitting or quality requirements — he said he would make no compromise on quality, even if that meant pushing back the opening rather than delivering a result below his ambitions. He also noted that the €100 million budget has already absorbed the additional cost linked to the delay.

93 keys designed for space, not volume

The property will comprise 88 guestrooms and 5 free-standing villas, for 93 units in total, arranged around six pools. The wellness offering will be built around the Oasis Spa, a 900 sqm space. Its architectural signature rests notably on the Floating Rock Bar, a space suspended above the Aegean Sea designed as the resort’s landmark.

This deliberately limited room count reflects a conscious choice rather than a land constraint: Sawiris explained that he chose not to maximise the number of keys, in order to prioritise space, privacy and exceptional views of the island. He also described near-daily personal involvement in the project, without intervening in every technical detail.

A brand built outside international standards

The choice to develop a proprietary brand rather than partner with an international hotel group is a deliberate one. According to Naguib Sawiris, relying on an established name would have been simpler, but he wanted to create something specific to Ora, built on his own vision of hospitality and his attachment to Mykonos.

Inline article ad 1 ☟

He said this would certainly not be just another six-star hotel, adding that the ambition was to create one of the most beautiful and elegant resorts in the Mediterranean, offering a highly distinctive experience and a unique character. — Naguib Sawiris

Naguib Sawiris also placed his project within a broader reflection on the destination’s future, suggesting that Mykonos may have reached its limits in terms of traditional hotel development, while a new, more sustainable form of luxury still has a place on the island.

A second attempt after the closure of Yi Mykonos

Signature du projet en 2023 @ credit Ora Developers
Project signing in 2023 © credit Ora Developers

Silversands Mykonos is not the group’s first property on the island. Yi Mykonos, a 41-room boutique hotel with private pools launched in 2023 in the Elia area, ceased operations at the end of 2024 and remained closed throughout the 2025 season. Naguib Sawiris has never publicly commented on the reasons for that closure or on how the two projects relate to one another. The new resort forms part of a repositioning strategy, with a more ambitious format and a distinct location.

Mykonos, playground for international luxury hospitality

The project arrives amid strong hotel activity on the island. Four Seasons opened its Mykonos hotel in summer 2026 in partnership with AGC, while the Barrière group launched the Fouquet’s Mykonos in June 2026 alongside Yoda Group. Accor, for its part, has formed a partnership with the Daktylides family for an MGallery address.

Sources in the Greek market cited by local press describe this sequence of openings as a deliberate repositioning of the destination, geared towards the years following the current period of uncertainty, rather than a simple accumulation of luxury properties.

An HR structure taking shape ahead of opening

Maria Vesleme @ credit linkedIn
Maria Vesleme © credit LinkedIn

Ora Hospitality and Silversands have appointed Maria Vesleme as senior director of human resources for the resort. She has held HR leadership roles within international groups such as Four Seasons Hotels & Resorts and Starwood Hotels & Resorts, with experience including pre-opening projects.

In her new role, Maria Vesleme will oversee the resort’s HR strategy, including talent development, recruitment, team engagement and day-to-day HR operations. She will also be responsible for structuring the HR function and supporting the development of internal policies and processes ahead of the opening.

Economic impact and next projects in Greece

Sawiris estimates the project will create around 250 direct jobs, with a further 1,000 indirect jobs, with a knock-on effect expected on the island’s local suppliers, restaurants and transport sector.

The businessman does not present Silversands Mykonos as a standalone project. He said he wants to develop further projects in Greece, a country for which he expressed particular affection, and confirmed he is currently exploring investment opportunities in the Athens region.


At a glance by The Hospitality Tribune

Naguib Sawiris invests €100 million in Silversands Mykonos, opening pushed to May 2027
Naguib Sawiris built his fortune in telecoms (Orascom Telecom Holding, later part of VEON); net worth ~$7.3 billion (Bloomberg)
Opening delayed from 2026 to May 2027 due to construction and permitting challenges; the €100 million already covers the added cost
88 guestrooms + 5 free-standing villas (93 keys total), 6 pools and a 900 sqm Oasis Spa
Deliberately capped room count to prioritise space and privacy over volume; no international brand affiliation
Expected to create ~250 direct and ~1,000 indirect jobs; Sawiris is now evaluating opportunities near Athens

This week's senior hospitality vacancies on DH2DH

View all opportunities on DH2DH →

À la une

360°: global hospitality news round-up, 9 October 2026 | From Barcelona to Bangkok via Brazzaville and Rehoboth Beach

🔎 Trend of the day: AI, the new engine of hotel performance. From conversational distribution to real-time pricing, industry players are embedding artificial intelligence at the heart of their value chain, from booking through to profitability management.

Hong Kong, China | Conor Hadlington appointed General Manager of Conrad Hong Kong

Hilton has entrusted the general management of Conrad Hong Kong to Conor Hadlington, who took up the post on 28 September 2026. A veteran of Mandarin Oriental, InterContinental and Shangri-La, the British executive now oversees operations, commercial strategy and the delivery of brand standards at the 513-room hotel in Pacific Place, in the Admiralty district.

US | Braemar Hotels & Resorts sells Four Seasons Resort Scottsdale for €318m and completes its exit from Ashford

Braemar Hotels & Resorts (NYSE: BHR) has signed a definitive agreement to sell the Four Seasons Resort Scottsdale, in Arizona, for $372 million (around €318m). Closing is expected on 22 October 2026. The Dallas-based listed REIT is using the proceeds to fund its separation from Ashford Inc. and will become a self-managed REIT focused on seven luxury hotels in the United States and the Caribbean.

Governance, Singapore | Chin Fen Eu to step down as CEO of Frasers Hospitality as the group reorganises its governance

Frasers Property Limited has announced the departure of Chin Fen Eu, CEO of Frasers Hospitality, effective 1 January 2027. The Singapore-based group is using the transition to split the governance of its hospitality arm between operations, entrusted to Chew Hang Song, and investment, placed under the responsibility of Eric Gan.

Mouvements